MINERAL RESOURCES AND MINERAL RESERVES

Introduction

The purpose of this report is to document the mineral resources and mineral reserves of Merafe Ferrochrome in accordance with the requirements of the SAMREC Code (The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves, 2009). All Merafe’s operations are part of a pooling and sharing venture with Xstrata Alloys (the Xstrata-Merafe Chrome Venture, known as the Venture). Merafe has a 20.5% participation interest in the mineral resources and mineral reserves of the Venture. The estimates in this document are as at 31 December 2012. The reporting date was moved forward from the end of June to the end of December during the 2011 reporting period so that it coincides with the Venture’s financial year. The mined-out positions have been kept as at the end of June 2012. To arrive at a mineral resources and mineral reserves estimate for 31 December 2012, the budgeted production for July 2012 to December 2012 has been subtracted from the total estimates. The mineral resource and mineral reserve information in the tables on the following pages is based on information compiled by a Competent Person (as defined by the SAMREC Code).

Statement by Competent Person

The mineral resource and mineral reserve statement has been reviewed and the relevant data extracted and compiled by Pieter-Jan Gräbe (P-JG). P-JG is the Lead Competent Person, registered with the South African Council for Natural Scientific Professions (SACNASP, Private Bag X450, Silverton, 0127), Reg. No. 400177/87. He holds a BSc Hons degree in Geology as well as an NHD in Metalliferrous Mining. P-JG is a geologist with 27 years’ experience in mineral exploration and mining geology, directly linked to the mining industry and currently a fulltime employee of Xstrata Alloys. P-JG consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

Pieter-Jan Gräbe
Xstrata Alloys
PO Box 2131
Rustenburg
0300
RSA
Tel: (014) 590 2415
Fax: (014) 590 2498


  For more information on the Merafe structure see page 3 of this report

Definitions

The following definitions (as per the SAMREC Code 2009) have been applied in estimation and categorisation of the mineral resources and mineral reserves disclosed within this document.

Mineral Resource:

Is a concentration or occurrence of material of economic interest in or on the earth’s crust in such form, quality and quantity that there are reasonable and realistic prospects for eventual economic extraction. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are known, or estimated from specific geological evidence, sampling and knowledge interpreted from an appropriately constrained and portrayed geological model. Mineral Resources are subdivided, and must be so reported, in order of increasing confidence in respect of geoscientific evidence, into Inferred, Indicated and Measured categories.

A deposit is a concentration (or occurrence) of material of possible economic interest, in or on the earth‘s crust, that may include mineralised material that cannot be estimated with sufficient confidence to be classified in the Inferred category. Portions of a deposit that do not have reasonable and realistic prospects for eventual economic extraction are not included in a Mineral Resource.

Inferred Mineral Resource:

Is that part of a Mineral Resource for which volume or tonnage, grade and mineral content can be estimated with only a low level of confidence. It is inferred from geological evidence and sampled and assumed but not verified geologically or through analysis of grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that may be limited in scope or of uncertain quality and reliability.

Indicated Mineral Resource:

Is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on information from exploration, sampling and testing of material gathered from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological or grade continuity but are spaced closely enough for continuity to be assumed.

Measured Mineral Resource:

Is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable information from exploration, sampling and testing of material from locations such as outcrops, trenches, pits, workings and drill holes. The locations are spaced closely enough to confirm geological and grade continuity.

Mineral Reserve:

The economically mineable material derived from a Measured or Indicated Mineral Resource or both. It includes diluting and contaminating materials and allows for losses that are expected to occur when the material is mined. Appropriate assessments to a minimum of a pre-feasibility study for a project and a life of mine plan for an operation must have been completed, including consideration of, and modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors (the modifying factors). Such modifying factors must be disclosed.

Probable Mineral Reserve:

Is the economically mineable material derived from a Measured or Indicated Mineral Resource or both. It is estimated with a lower level of confidence than a Proved Mineral Reserve. It includes diluting and contaminating materials and allows for losses that are expected to occur when the material is mined. Appropriate assessments to a minimum of a pre-feasibility study for a project or a life of mine plan for an operation must have been carried out, including consideration of, and modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. Such modifying factors must be disclosed.

Proved Mineral Reserve:

Is the economically mineable material derived from a Measured Mineral Resource. It is estimated with a high level of confidence. It includes diluting and contaminating materials and allows for losses that are expected to occur when the material is mined. Appropriate assessments to a minimum of a pre-feasibility study for a project or a life of mine plan for an operation must have been carried out, including consideration of, and modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. Such modifying factors must be disclosed.

Figure 1: Location of the Venture’s operations
Figure 1: Location of the Venture’s operations
 

Brief description of exploration activities

The Venture’s exploration activities aim to increase geological knowledge and confidence in its mineral resource base and to comply with legislative requirements. Exploration is done on two fronts; exploration is done ahead of operations in current mining areas to support the mining activities, whilst project areas are explored to define and quantify new resources. Exploration is done on an annual basis, primarily through the drilling of vertical exploration drillholes. Geophysical surveys (mainly airborne magnetic surveys) have been conducted on all major operating mines and projects. The bulk of the exploration drillholes are drilled, as far as possible, on a pre-determined grid whilst further drillholes are drilled to target geological anomalies and to provide geological and geotechnical information for mine planning.

A total of R17.404 million was spent on drilling 21 148 metres of surface exploration drillholes for the Venture operations and projects in FY2012.

No feasibility studies were conducted during the reporting period.

Geological setting

The Venture’s chrome ore-bodies occur in the Bushveld Complex and its silica deposit occurs in the Magaliesberg Formation of the Transvaal Super Group (Figure 1). Both these geological occurrences are found in South Africa. Chrome ore is mined from both underground (mostly) and opencast workings, while silica is only mined in opencast workings.

The Bushveld Complex

The two billion year old Bushveld Complex (the Complex) is the world’s largest known layered igneous intrusion and covers an area of 65 000km2. The Complex is host to the majority of the world’s PGM, chromite and vanadium resources.

The Complex is divided into five compartments; the Western Limb, the Eastern Limb, the Northern Limb, the far Western Limb and the Bethal Limb (Figure 1). Merafe has operations on the Eastern and Western Limbs of the complex. The Bushveld Complex is divided vertically into four suites of rocks; the Rooiberg Group, the Rustenburg Layered Suite, the Rashoop Granophyre Suite and the Lebowa Granite Suite. The mafic Rustenburg Layered Suite hosts the chromite deposits of the complex in the highly continuous chromitite layers of the Critical Zone. The complex reaches a vertical thickness of up to 9 000m. The Critical Zone contains 14 individually recognisable chromitite layers with varying thicknesses and grades. The primary chromitite layers targeted for chromite extraction are the LG6A and LG6 Chromitite Layers, usually mined as a package, and the MG1 Chromitite Layer. The LG6 Package consists of the lower LG6 Chromitite Layer which is separated from the LG6A Chromitite Layer by a pyroxenite (waste) middling. The MG1 Chromitite Layer consists of a single chromitite layer, with occasional discontinuous internal waste partings.

Figure 2: Schematic stratigraphy of the
Rustenburg Layered Suite with special
reference to the chromitite layers.

(illustration not to scale)
Schematic stratigraphy of the Rustenburg Layered Suite with special reference to the chromitite layers.
 

Magaliesberg Formation

The Magaliesberg Formation is made up of a package of individual layers of shale, quartzite and hornfels, which form a sub-formation of the Pretoria Group of the Transvaal Supergroup. The quartzite layers of the formation were formed by the deposition of sandstone sediments into the Transvaal Basin around 2.2 billion years ago. The Magaliesberg Formation is a massive sequence of quartzite and minor hornfels reaching a few hundred metres in thickness. The quartzites form a prominent topographical ridge (mountain range) around the rim of the Bushveld Complex. The Rietvlei deposit occurs along a prominent quartzite ridge which strikes north-south. The ore-body dips towards the east at dips varying between 320 – 620. Jointing throughout the formation is fairly prominent. The quartzite is very pure, with an average content of SiO2 of over 90%. There are no indications on surface of major geological disturbances. A major regional fault (the Rustenburg Fault) is developed to the southeast of the mine (just off the mine property).

Type of mining and mining activities

The Venture has chrome mining operations along the Western and Eastern Limbs of the Bushveld Complex. The operations along the Western Limb of the Bushveld Complex comprise the Waterval, Kroondal, Boshoek, Horizon and Wonderkop mines. The LG6 Package at both Waterval and Kroondal mines is mined underground using trackless mining methods on a bord-and-pillar layout. Boshoek Mine is 20km northwest of Rustenburg. The MG1, LG5 and LG6 Chromitite Layers are being mined in open pits. Horizon Mine lies just west of the Pilanesberg Complex. The LG6 Chromitite Layer is currently being mined at Horizon Mine through underground operations. Wonderkop Mine, Waterval/Klipfontein and Extension 9 are exploration projects.

Thorncliffe, Magareng and Helena mines are situated along the southern portion of the Eastern Limb of the Bushveld Complex. The MG1 Chromitite Layer is being mined underground using trackless mining methods on a bord-and-pillar mining layout. De Grooteboom lies contiguous to and immediately north of Thorncliffe Mine.

The Venture’s silica deposit lies 15km west of Rustenburg. Rietvlei Silica is an opencast mine. The quartzite is mined mainly to supply the Venture’s furnaces with silica.

Ore production

The Venture has mined 4.276Mt ROM ore from 1 January to 31 December 2012 against a budget of 5.036Mt. The main contributors to the lower than budgeted ROM tonnage are Waterval, Kroondal, Thorncliffe and Helena mines. The lower ROM production at Waterval Mine is mainly due to industrial action and mining operational issues. Kroondal Mine experienced similar industrial action. At Helena Mine the main reasons for the lower production were equipment breakdowns, Section 54 stoppages and mining operational reasons. The 2012 ROM tonnage is higher than the 2011 ROM production of 3.912Mt as production activities at the main production units have remained more or less the same as the 2011 production year. Waterval, Magareng and Helena mines are in build-up phases and increasing their production rates year-on-year.

The estimates in this statement reflect the mineral resources and mineral reserves as at 31 December 2012.

Legal entitlement

All new order mining rights applications, mining right conversions, prospecting rights conversions and new order prospecting rights for all the main operating units, have been granted and executed by the Department of Mineral Resources. Certain Section 102 and Section 11 applications under the MPRDA remain in the ordinary administrative process, and the Venture has little reason to believe these will not be granted in due course.

In respect of a portion of Horizon Mine (Ruighoek and Vogelstruisnek), an application to the High Court has been made by certain surface rights owners at the mine to review and set aside the conversion of mining rights granted by the Minister of the Department of Mineral Resources and to request that the conversion process start again. This issue has been settled and as the area concerned does not fall within the anticipated five-year mining area it will therefore have no impact on short-term mine production.

Description of the method and assumptions made to estimate mineral resources and mineral reserves

Chrome

Raw geological data is validated through various steps and routines before being compiled into a final database.

The database data is statistically and geostatistically analysed to determine the inherent characteristics and variability of the data. The ore-body characteristics that are analysed are the distribution and variability of the thickness, SG of the chromitites and the critical grade elements (Cr2O3, FeOtotal and SiO2). The results of the geostatistical analysis are used as input parameters for the creation of grade and thickness block models covering the entire mining or project area. The block models form the basis from which the tonnage and grades are reported for the various mineral resource and mineral reserve blocks and categories. The mineral resource categories are mainly based on the data point density. A data point density of approximately 200m x 200m is used for the classification of measured mineral resources. For indicated mineral resources a density of between 200m and 400m is used. inferred mineral resources will be classified where the density is lower than 400m x 400m. The geostatistical analysis of the exploration data has indicated semi-variogramme ranges of at least 250m going up to 2 000m. Geological structural characteristics are used in addition to support the drilling density.

Other factors that are taken into consideration are regional geology and the proximity of other operating or worked-out mines and projects. All the non-mineralised areas, and areas that may not be mined for various legislative or other reasons are excluded from the mineral resources, e.g. boundary pillars, crown pillars, large potholes, transgressive geological bodies, fault zones, etc. The mineral reserves are estimated by applying modifying factors to convert the indicated mineral resources to probable mineral reserves and the measured mineral resources to proved mineral reserves. The following modifying factors are used: an estimated geological loss factor (determined by losses in mined-out areas and projected forward), the predetermined mining extraction rate, ore losses and ore contamination from mining over break. The mineral reserve areas are restricted to the five-year detailed mine plan, except in the case of Waterval, Thorncliffe and Kroondal mines. In these cases the LOM plans form the basis for the mineral reserves. No inferred mineral resources have been converted to mineral reserves.

Chrome mineral resource   Quartzite mineral resource
Chrome mineral resource   Quartzite mineral resource
     

Silica

The silica mineral resources are estimated by modelling the quartzite hill that is being mined. The volume of the quartzite hill is determined from the 1 340m level (amsl) to the current topographical surface. The volume is multiplied by the assayed SG for the Rietvlei quartzite to determine the in-situ tonnage. The quartzite is exposed through the opencast mine workings and along the slopes of the hill. The exploration core boreholes, the beneficiation process, the protruding hill itself, as well as excavations from mining have been used as criteria for classifying the deposit as an indicated mineral resource.

Comparison of mineral resource and mineral reserve estimates with previous year’s estimates

The annual mineral resource and mineral reserve estimates are compared with the previous year’s statement and reconciled each year after the estimates have been finalised. Changes in the year-on-year tonnage and grade estimates are mainly due to mining depletion and changes in the mineral resource and mineral reserve tonnages and grades due to additional geological information.

Mineral resource reconciliation

The year-on-year change in chromitite resource tonnages is the most prominent at the Thorncliffe and Helena properties. The change is due to the introduction of the MG2 Chromitite Layer into the resource statement. The net change in mineral resources tonnage for every property after mining depletion is shown above.

There is no material difference in the silica mineral resource estimate from January 2011 to December 2012 and the change is almost entirely attributed to mining depletion.

Mineral reserve reconciliation

The biggest year-on-year changes in the ore reserves were recorded at the Kroondal Gemini, Horizon and Thorncliffe properties. The reserve increase at Kroondal Gemini is mainly due to inferred mineral resources upgraded to indicated mineral resources and subsequently modified to mineral reserves and a change in the mining extraction rate. The Horizon mineral reserves were estimated and declared for the first time, hence the increase. Thorncliffe had a net increase in mineral reserves mainly due to inferred mineral resources upgraded to indicated mineral resources followed by the modification of those mineral resources to mineral reserves.

Auditing

An internal audit is conducted annually on the estimation process. The 2012 estimation process was audited internally by Xstrata Alloys’ Auditing Services. The internal audit report is presented to the Xstrata Alloys Audit Committee. The internal audit focused on verifying whether the estimation process complied with the Xstrata inhouse “Procedure for the Estimation of Mineral Resources and Ore Reserves” and the requirements of the reporting code. The audit involved site visits to the chrome mining operations as well as Xstrata Mining Division Head Office. No major issues were raised and the minor issues raised will be addressed during the current reporting period.

Statement regarding inferred mineral resources and feasibility studies

No feasibility studies were conducted during the reporting period on any of the mines or projects and hence no inferred mineral resources have been included in any feasibility studies. No inferred mineral resources have been modified to mineral resources.

Chrome ore reserves
Chrome ore reserves

Material risk factors

There are no foreseen material risk factors that could affect the validity of the current mineral resource and mineral reserve statement. All the legislative requirements have been met with respect to the rights to mining and prospecting for which the mineral resources and mineral reserves have been reported. All the operating mines are mining under new order, executed, Mining Rights. The Prospecting Rights of all the prospecting areas have been converted to new order Prospecting Rights.

Summary of environmental funding and management

All Venture operations have developed and implemented their own environmental management programmes (EMP) and systems which are fully aligned with ISO 14001 and the ICMM principles of sustainable development. All operations follow the Xstrata inhouse 17 Sustainable Development Standards which were compiled based on ISO standards. Baseline biodiversity and landscape function studies are conducted at the feasibility or exploration phase of projects and environmental risk assessments associated with impacts on biodiversity and landscape functions are undertaken for new operations or major changes to existing operations. Information from these studies is used, in consultation with the affected parties and concerned external stakeholders, for the development and implementation of biodiversity and landscape function management systems and programmes. Various audits are conducted across the operations. These range from internal audits to third party external audits. The Venture also makes use of specialist reports where necessary. The Venture sets targets and effectively measures environmental performance against such targets and benchmarks their performance against leading practices in the industry. Such targets and performances are reviewed at regular intervals to ensure continual improvement of environmental performance. The Venture has introduced key performance indicators on the reuse and recycling of waste in 2012. The target was set at 10%. All employees are coached and trained regarding the efficient use of natural resources, reducing input material and waste. All operations have closure plans which entail the rehabilitation of all disturbed areas, buildings etc. These plans are reviewed annually and amended where applicable. They include closure cost estimates and anticipated costs of rehabilitation and restoration are provided for throughout the life of the operations. The estimated rehabilitation costs are provided for by means of a bank guarantee. Day-to-day cost relating to environmental issues is budgeted for on an annual basis.

Mineral resources and mineral reserves statement

The reporting date for the mineral resources and mineral reserves is 31 December 2012.

Chrome mineral resources

        Measured mineral resources Indicated mineral resources Measured and indicated resources Inferred mineral resources  
Name of
operation
Attributable
portion
Mining
method
Commodity 31.12.12 31.12.11 31.12.12 31.12.11 31.12.12 31.12.11 31.12.12 31.12.11 Competent
Person
Operating mines              
Waterval 20.5% UG (Mt) 16.609 16.530 0.98 1.36 17.59 17.89 0.6 0.6 DR/PJG
      Cr2O3(%) 41.29 41.20 42.6 42.5 41.4 41.3 43 43  
Marikana West 20.5% UG (Mt) 3.530 3.217 1.59 2.06 5.12 5.27 5.12 – DR/PJG
(Waterval Ext)     Cr2O3(%) 42.38 42.34 42.6 42.7 42.5 42.5 42.5 –  
Kroondal 20.5% UG/OC (Mt) 9.811 9.995 1.82 1.89 11.64 11.89 0.1 – DR/PJG
      Cr2O3(%) 42.87 42.91 42.4 42.6 42.8 42.9 42 –  
Kroondal Gemini 20.5% UG/OC (Mt) 10.854 9.846 6.47 7.76 17.33 17.61 0.2 0.2 DR/PJG
(Kroondal ext)     Cr2O3(%) 42.83 42.98 42.2 42.4 42.6 42.7 42 42  
Marikana East 20.5% UG (Mt) 4.485 3.874 0.49 1.21 4.97 5.08 0.3 0.3 DR/PJG
(Kroondal ext)     Cr2O3(%) 42.35 42.41 42.3 42.3 42.3 42.4 42 42  
Horizon 20.5% UG/OC (Mt) 4.080 4.023 9.74 10.09 13.82 14.11 9.1 8.8 DR/PJG
      Cr2O3(%) 44.78 44.99 43.9 44.0 44.1 44.3 44 45  
Boshoek 20.5% OC/UG (Mt) 0.350 0.739 16.87 16.87 17.22 17.61 – – DR/PJG
      Cr2O3(%) 39.43 40.38 40.4 40.4 40.4 40.4 – –  
Thorncliffe 20.5% UG/OC (Mt) 44.382 41.322 9.70 12.51 54.09 53.83 35.7 13.6 DR/SV
      Cr2O3(%) 40.58 40.46 40.8 40.9 40.6 40.6 40 41  
Helena 20.5% UG/OC (Mt) 19.673 18.744 7.49 9.06 27.17 27.81 88.0 56.8 DR/SV
      Cr2O3(%) 40.48 40.53 39.5 39.5 40.2 40.2 39 39  
Subtotal     (Mt) 113.773 108.289 55.17 62.81 168.94 171.10 133.9 80.4  
      Cr2O3(%) 41.35 41.33 41.4 41.4 41.36 41.4 40 40  
Projects                        
Wonderkop 20.5% UG (Mt) – 0.452 7.05 6.84 7.05 7.29 – – PJG/DR
      Cr2O3(%) – 40.20 40.6 40.5 40.6 40.5 – –  
Extension 9 20.5% UG (Mt) – – 13.89 12.61 13.89 12.61 – – PJG/DR
      Cr2O3(%) – – 41.0 40.8 41.0 40.8 – –  
De Grooteboom 20.5% UG/OC (Mt) 0.802 0.808 0.65 0.66 1.45 1.47 – – SV/DR
      Cr2O3(%) 40.28 40.28 40.3 40.3 40.3 40.3 – –  
Klipfontein/ Waterval 20.5% UG (Mt) 8.277 4.476 13.81 15.78 22.09 20.26 121.6 123.4 PJG/DR
      Cr2O3(%) 42.35 42.82 42.5 42.6 42.4 42.7 42 42  
Subtotal     (Mt) 9.080 5.735 35.80 35.90 44.48 41.64 121.6 123.4  
      Cr2O3(%) 42.17 42.26 41.5 41.5 41.6 41.6 42 42  
Total     (Mt) 122.853 114.024 90.57 98.71 213.42 212.28 255.5 203.8  
      Cr2O3(%) 41.41 41.38 41.4 41.5 41.4 41.4 41 42  

Notes
Tonnages are quoted as million metric tonnes.
Grades are quoted as % Cr2O3.
The measured and indicated mineral resources are inclusive of those mineral resources modified to produce ore reserves.
No cut-off grades are applied to the chromitite layers currently being mined because of the exceptional regional grade consistency and continuity.
The mineral resources are estimated as chromitite tonnages and grades to reflect the grades of the various individual chromitite layers. The LG6A and MG1
Chromitite Layers which Xstrata is currently mining, are discrete solid chromitite layers.
Changes in the year-on-year mineral resource tonnage and grade estimates are mainly due to mining depletion and changes due to additional geological information
gained through exploration.

Chrome mineral reserve statement

        Proved mineral reserves Probable mineral reserves Total mineral reserves  
Name of operation Participation
interest
Mining
method
Commodity 31.12.12 31.12.11 31.12.12 31.12.11 31.12.12 31.12.11 Competent
Person
Operating mines                    
Waterval 20.5% UG (Mt) 11.044 10.253 0.91 1.23 11.95 11.48 PJG/DR
      Cr2O3(%) 30.84 31.35 26.0 26.5 30.5 30.8  
Marikana West 20.5% UG (Mt) 1.077 0.973 – – 1.08 0.97 PJG/DR
      Cr2O3(%) 28.59 28.65 – – 28.6 28.7  
Kroondal 20.5% UG/OC (Mt) 3.113 3.227 1.69 1.66 4.80 4.89 PJG/DR
      Cr2O3(%) 28.76 28.28 28.6 27.8 28.7 28.1  
Kroondal Gemini 20.5% UG/OC (Mt) 7.507 6.288 6.15 6.94 13.66 13.23 PJG/DR
(Kroondal ext)     Cr2O3(%) 31.22 31.49 28.5 28.7 30.0 30.0  
Marikana East 20.5% UG (Mt) 1.203 0.726 _ 0.02 1.20 0.74 PJG/DR
(Kroondal ext)     Cr2O3(%) 28.14 28.71 _ 27.3 28.1 28.7  
Horizon 20.5% UG/OC (Mt) 2.314 1.743 0.15 0.07 2.46 1.81 PJG/DR
      Cr2O3(%) 25.51 34.08 25.2 28.5 25.5 33.9  
Boshoek 20.5% UG/OC (Mt) _ _ 0.45 – 0.45 _ PJG/DR
      Cr2O3(%) _ _ 23.1 – 23.1 _  
Thorncliffe 20.5% UG/OC (Mt) 27.788 25.660 4.76 6.56 32.55 32.22 SV/DR
      Cr2O3(%) 37.25 37.90 37.9 39.1 37.3 38.2  
Helena 20.5% UG/OC (Mt) 4.588 4.131 _ _ 4.59 4.13 SV/DR
      Cr2O3(%) 35.14 34.96 _ _ 35.1 35.0  
      (Mt) 58.632 52.999 14.11 16.48 72.74 69.48  
Total     Cr2O3(%) 33.85 34.64 31.3 32.6 33.4 34.2  

Notes
Tonnages are quoted as million metric tonnes.
Grades are quoted as %Cr2O3.
No cut-off grades are applied to the chromitite layers currently being mined because of the exceptional regional grade consistency and continuity. A minimum
mining cut of 1.8m is applied to the ore reserve tonnage to accommodate the mechanised mining equipment employed by the underground mining operations.
External waste is included to make up the minimum cut where applicable.
The chromitite layers are mined mainly underground using trackless mechanised mining methods on a bord-and-pillar mine layout design.
Changes in the year-on-year mineral reserves tonnage and grade estimates are mainly due to mining depletion and changes due to additional geological
information gained through exploration.

Competent persons;
PJG – Pieter-Jan Gräbe, Xstrata Alloys (SACNASP). Overall responsibility for mineral resources and mineral reserves.
SV – Solly Vaid, Xstrata Alloys (PLATO). Overall responsibility for mineral resources and mineral reserves.
DR – Dean Richards, Obsidian Consulting Services (SACNASP). Responsible for geostatistical analysis of data, mineral resource classification and construction
of tonnage and grade block models and reporting of tonnage and grades from block models.

  For more detailed information on Merafe ownership of specific mines please see page 129 of the annual financial statements

Mineral resource and mineral reserve maps

Mineral resource and mineral reserve maps
Chrome – Bushveld Complex, Western Limb
Waterval, Marikana West, Waterval/Klipfontein, Kroondal, Marikana East, Gemini and Wonderkop

Silica mineral resources

        Measured mineral
resources
Indicated mineral
resources
Measured and
indicated resources
Inferred mineral
resources
 
Name of
operation
Participation
interest
Mining
method
Commodity 31.12.12 31.12.11 31.12.12 31.12.11 31.12.12 31.12.11 31.12.12 31.12.11 Competent
Person
Operating mine                      
Rietvlei 20.5% OC (Mt) – – 25.12 25.18 25.12 25.18 – – PJG
      SiO2 (%) – – 91 91 91 91 – –  
Total     (Mt) – – 25.12 25.18 25.12 25.18 – –  
      SiO2 (%) – – 91 91 91 91 – –  

Silica mineral reserves

        Proved ore
reserves
Probable ore
reserves
Total ore
reserves
 
Name of operation Attributable
portion
Mining
method
Commodity 31.12.12 31.12.11 31.12.12 31.12.11 31.12.12 31.12.11 Competent
Person
Operating mine                    
Rietvlei 20.5% OC (Kt) – – 89.4 – 89.4 – PJG
      SiO2 (%) – – 91 – 91 –  
      (Kt) – – 89.4 – 89.4 –  
Total     SiO2 (%) – – 91 – 91 –  

Notes
Tonnages are quoted as million metric tonnes.
Grades are quoted as %SiO2.
The Rietvlei silica ore is mined through opencast mining methods and the ROM (run of mine) ore is crushed, washed and sized on site to produce a final sized and quality graded product. No silica cut-off grades are applied to the mineral resource estimation. The quartzite is mined mainly to supply the Xstrata Alloys furnaces with silica.

Changes in the year-on-year tonnage and grade estimates are mainly due to mining depletion, reclassification of the mineral resource categories and changes in the mineral resource tonnages and grades due to additional geological information gained through exploration.
No significant changes have been recorded in the year-on-year mineral resource estimation.
Ore reserves for Rietvlei Silica were declared for the first time with the introduction of bench mine plans for the opencast.
The life of mine for Rietvlei Silica mine is four months based on the declared ore reserves and a production rate of 27kt ROM per month. The life of mine period based on all the mineral resources converted to ore reserves is 75 years. The Mining Right expires in 2037.

Competent Person;
PJG – Pieter-Jan Gräbe, Xstrata Alloys (SACNASP), Overall responsibility of mineral resources and mineral reserves

Horizon Mine   Boshoek Mine   Townlands Extension 9
Chrome – Bushveld Complex, Western Limb        
Horizon Mine   Boshoek Mine   Townlands Extension 9
Thorncliffe, Magareng, Helena and De Grooteboom mines   Rietvlei Mine
Chrome – Bushveld Complex, Eastern Limb   Silica

Thorncliffe, Magareng, Helena and De Grooteboom mines

  Rietvlei Mine
back to top ^
ICONS USED IN THIS REPORT   DOWNLOADS
     
 
› Complete annual report [PDF - 3MB]
› Financials
› Segmented downloads