How the Venture disposes of waste also depends on the
local opportunities to recycle or reuse waste. Accredited
service providers dispose of the waste the Venture is
unable to recycle in a responsible manner. Materials
currently recycled include scrap metal, paper, wood and
conveyor belts.
The largest volume of waste the Venture produces is
mineral waste, which includes waste rock removed
to expose ore. This waste can be placed in disused
opencast or underground operations, reused during
site rehabilitation or stockpiled. Tailings and slag from
processing ore and concentrates, are recycled or reused
whenever possible.
The Venture’s emissions
| Category |
2012
(tonnes) |
|
2011
(tonnes) |
|
2010
(tonnes) |
|
| NOx (oxides of nitrogen) |
|
|
|
|
|
|
| Stack emissions (total mass) |
222 |
|
159 |
|
184 |
|
| SOx (oxides of sulphur) |
|
|
|
|
|
|
| Stack emissions (total mass) |
2 549 |
|
2 365 |
|
3 574 |
|
| Total particulates |
|
|
|
|
|
|
| Stack emissions (total mass) |
1 608 |
|
2 166 |
|
1 432 |
|
Mineral waste
| Category |
2012
(tonnes) |
|
2011
(tonnes) |
|
2010
(tonnes) |
|
| Mineral waste-recycled |
1 521 116 |
|
1 372 889 |
|
1 789 004 |
|
| Mineral waste – disposed |
3 638 000 |
|
4 478 552 |
|
9 195 910 |
|
| Mineral waste – produced |
4 806 050 |
|
5 007 406 |
|
9 359 752 |
|
| Non-mineral waste – recycled |
9 767 |
|
14 772 |
|
21 899 |
|
| Non-mineral waste – disposed |
2 793 |
|
6 351 |
|
7 159 |
|
| Non mineral waste – produced |
12 560 |
|
21 123 |
|
29 058 |
|
Excavated materials, overburden and waste rock have been recorded under mineral waste calculations. As of 2012 no distinction is made between
Mineral waste onsite and offsite disposal. 2010 and 2011 numbers have been instated accordingly.
The Venture recycles UG2 ore, a waste product of the
platinum refining process, using it to make chromite
pellets which are used in its ferrochrome smelters.
Effluents
All the Venture’s operations are zero-effluent discharge
operations. In terms of our licence conditions and
requirements we may only discharge effluent in an
emergency and in consultation with the relevant
authorities.
Management of overburden, rock, tailings
and sludge/residues
The Sustainable Development Standards and guidelines
applied in the Venture’s operations set stringent
expectations for the management of tailings and waste
rock facilities.
Tailings from its operations are generally stored in
specially designed dams during the life of the operation.
The Venture prioritises the maintenance of the integrity
of tailings dams, as even a small amount of leakage could
negatively impact local water quality, and takes great care
in their design and management. It has processes in place
to ensure it continually checks the structural capacity of
these dams and to monitor ground waste.
The Venture stores waste rock in dumps, which it
rehabilitates by shaping rock piles and revegetating them
to mimic the natural environment.
Water
Water is a finite and precious natural resource essential to
the sustainability of the communities in which the Venture
works. It is also necessary for its mining and metallurgical
processes.
Redefining water use
The Venture aims to use water as efficiently as possible
and to avoid any negative impacts on water quality in the
environments in which it works. Its water use includes
water employed in its primary activities, which are mining
and smelting, and in its non-primary activities such as
dust control and garden maintenance. The Venture
mainly sources the potable water it uses in its operations
from a variety of water service providers, including local
municipalities.
Previously, all water used in dust suppression and plant
usage from dirty water onsite was considered recycled,
as this water was captured onsite and reused in the
activities onsite. The Venture has since revised how it
defines recycled and dirty water from onsite dewatering
activities. Essentially, it captures all rainwater that falls on
“dirty areas” and stores it for use in onsite activities such
as dust suppression.
Water usage measurement is an evolving area and the
Venture continues to refine how it measures water usage
and its collection processes, in order to meet its evolving
management and reporting needs.
Water use and availability
The Venture’s operations work with the Department of
Water Affairs, local communities, local authorities, the
farming community and other industry users to ensure the
sustainability of water resources and equitable access to
water resources for all stakeholders.
The availability of water is a key consideration when
the Venture plans the expansion or construction of an
operation. It uses the results of the ESIAs it undertakes
to guide its decision-making and to ensure it has the
least possible impact on local water resources during the
various phases of its projects.
| The Venture’s water usage |
 |
|
All the Venture’s operations have water conservation
plans. They have previously set water intensity targets and
have measures in place to help them be as water efficient
as possible. In addition its operations are identifying
possible water reduction projects.
The only water sources sensitive to withdrawal in the
Venture’s operations are the Dwars River and the licensed
boreholes at the Lion ferrochrome plant.
Incidents and compliance
It is always the Venture’s aim to have no environmental
incidents at its operations. It monitors, reports,
investigates and remediates any incidents that occur
and applies lessons learnt to prevent similar events
in the future. Its operations are required to report any
environmental high potential risk incidents (HPRI),
including near-misses, that could have resulted in a
category 4 or 5 incident, even when the actual impact was
less significant. Environmental incidents recorded at the
Venture’s operations include incidents that occur as the
result of contractor activity.
Progress
The Venture has had no environmental fines, penalties
or prosecutions at its operations for the past five years.
The Venture achieved its goal of no category 3, 4 or
5 incidents recorded in its operations in 2012 and no
category 4 or 5 incidents were recorded in the Venture’s
operations for the past six years.
Environmental incidents
| Incident category |
2012 |
|
2011 |
|
2010 |
|
2009 |
|
2008 |
|
2007 |
|
| Category 1 – negligible (causing negligible, reversible
environmental impact, requiring very minor or no remediation) |
89 |
|
76 |
|
62 |
|
47 |
|
32 |
|
40 |
|
| Category 2 – minor (causing minor, reversible environmental
impact, requiring minor remediation) |
8 |
|
7 |
|
24 |
|
22 |
|
10 |
|
4 |
|
| Category 3 – significant (causing moderate, reversible
environmental impact with short-term effect, requiring
significant remediation) |
0 |
|
0 |
|
0 |
|
0 |
|
1* |
|
0 |
|
| Category 4 – major (causing serious environmental impact, with
medium-term effect, requiring significant remediation) |
0 |
|
0 |
|
0 |
|
0 |
|
0 |
|
0 |
|
| Category 5 – disastrous (causing disastrous environmental impact,
with long-term effect, requiring major remediation) |
0 |
|
0 |
|
0 |
|
0 |
|
0 |
|
0 |
|
* Stormwater discharges off-site caused by dam overflows as a result of severe storms and heavy rainfall
Biodiversity and land management
Xstrata maintains a trust fund which contains a sum
equivalent to its estimate of the future costs of rehabilitating
the sites it manages over their operational lives. The Venture
does not have any areas of high biodiversity on the land it
owns, leases or manages.
Planning for rehabilitation and restoration
The Venture annually estimates the future costs of
rehabilitation and bases the value of the trust fund it
maintains on these estimates.
Its careful planning, management and investment in its
resources ensures that it rehabilitates and restores its
mine areas to an ecological status very similar to the
conditions that existed before its mining activities began.
The Venture also manages waste rock and closed mines
to prevent acid rock drainage occurring. It considers the
impact of its operations on local landscapes across the life
cycle of a site, from initial exploration to decommissioning
and closure.
Identifying potential impacts
The Venture conducts baseline biodiversity and landscape
function studies as part of its ESIAs of all its projects. They
are undertaken during the feasibility or exploration phase
of a project and they help the Venture to address any
runoff prevention, soil quality and landscape maintenance
issues such as soil erosion. It also conducts environmental
risk assessments for its new operations and for any major
changes to existing operations. These assessments,
having established the existing conditions of biodiversity
and landscape function (e.g. soil erosion control and
watershed management), identify the potential impacts of
the proposed activities that could be a risk to biodiversity
and landscape functions. They also identify the standards
that need to be applied or used as benchmarks, and
opportunities for improvements.
The Venture shares the information it gains from
baseline and risk-related studies with affected and
concerned stakeholders and uses it in its development
and implementation of biodiversity and landscape
function management systems and programmes and site
closure plans.
|